Current task: —

Updated 08-19-2026

Session 006 — Regroup & plan revision (user-requested)

Date: 2026-08-18 | Type: organizational (no new experiments)

Purpose

User asked for a full regroup before continuing: review goal, data, scripts, notes, checklist progress; revise the checklist; check off what qualifies; add new tasks the work so far implies; confirm everything is documented and saved; then state the next step.

Archive audit (findings + fixes)

Strategic assessment

Checklist changes (committed to NGUYEN.md)

Active order (carries forward the user-approved A3→A1→A2→C→B queue,

renumbered to the revised checklist)

  1. 2.6 — root-cause E-016 V3 (three candidates + discriminating tests in D-024 §4). THIS is the next action.
  2. 2.7 — Q-S3a analytic v± → A_∞^{−1}e^{±·}.
  3. 2.8 — Q-S3b prime-sum backend → a ~ 12–14.
  4. 1.6 — ξ′-world ceiling. 5. 1.7 — T4b scoping. Background/standing: 3.5 (Li asymptotics — start with §4A.3 literature sweep when a slot opens); E-015-class runs launch detached when useful.

Decisions


Session 006 cont. — Task 2.6: E-016 V3 root cause (COMPLETE)

What was done

Lessons logged (D-025 §8)

Next

Task 2.7 (Q-S3a): analytic v± → A_∞^{−1}e^{±·} — start with §4A.3 literature sweep (Suzuki §7, canonical systems inverse problems).


Session 006 cont.2 — Task 2.7: Q-S3a (COMPLETE — R-003 breakthrough)

What was done

Lessons logged

Next

Task 2.8 (Q-S3b): E-018 descent profile (|R_τ/R₀| on z = x+iy₀, y₀ ∈ {1, 0.3, 0.1}) first — cheap, informs the backend push to a ~ 12–14 with winding-based zero-flow tracking.


Session 006 cont.3 — Task 2.8(i): descent profile (COMPLETE)

What was done

Next

Task 2.8(ii): backend v2 (blockwise Λ, checkpointed prefix sums, e²⁴)


Session 006 cont.4 — Task 2.8(ii): backend v2 + a=12 (COMPLETE — no transition)

What was done

Next

Task 1.6: ξ′-world bandwidth-one ceiling (LawN256 analogue).


Session 006 cont.5 — Task 1.6: ξ′-world ceiling (COMPLETE — saturated)

Context

User asked to double-check the plan: original Phase 1 (1.1–1.5) IS complete; 1.6/1.7 were NEW regroup additions (session-005 queue items C and B). User chose option #1: do 1.6 then 1.7 as queued.

What was done

Next

Task 1.7 (T4b scoping): higher-derivative ξ⁽ᵏ⁾ node mechanism — scope only; verdict pursue/close.


Session 006 cont.6 — Task 1.7: T4b scoping (COMPLETE — closed)

What was done

Next

Two standing fronts (user's call): 3.5 Li asymptotic attack (criterion-#1 path) or the (★) analytic attack (Suzuki line).


Session 006 cont.7+8 — both fronts' designs (COMPLETE) + next-stage analysis

User directive

Do 3.5 then (★), one after another, then analyze data for next stage.

3.5 (Li asymptotic attack) — design complete

(★) (tail-cancellation) — design complete

Next-stage analysis (the data's verdict)


Session 006 cont.9 — task 3.6 done; 3.7 at ~90% (MID-TASK STOP, 5 PM)

What was done

RESUME (STATE.md IN PROGRESS)

Rerun E-021 --force (caches → ~20 min), then register, D-037, commit.