Current task: —

← Session 36 — ii′-6-DL dog-leg + side bounds; Paper A review

#2270 assistant 2026-08-26 17:34:51.337 UTC · 3382→861 tok open ⤢
thinking (1933 chars)
LiSideBounds is NOT yet root-imported (the root imports stop at LiDogLeg + the two skeletons). The 6-c-i commit (a8c5b1e) didn't add it to the root — build 8770 jobs was probably `lake build NguyenRH1.LiSideBounds` directly. Per the pattern (each new file gets root-imported at its sub-stage), I should add `import NguyenRH1.LiSideBounds` to the root now (6-c-ii is the first sub-stage where new content lands; the file is complete enough). Let me add the import + doc line. Then: full build `lake build NguyenRH1.LiSideBounds` (fast, single module + root), write AuditSession041.lean, run it, commit. Actually — for the build, per handoff notes: "For lake: SINGLE command per detached spawn; short PrintAxioms in foreground." A single-module build (LiSideBounds + root re-elaboration) — the root re-elaborates quickly (it's just imports). `lake build NguyenRH1.LiSideBounds` builds just that module (deps already built). Should be ~1-2 min. Then `lake build` for the root import check — hmm, `lake build NguyenRH1` builds everything — that could take longer but everything's cached except LiSideBounds + root. Let me do `lake build` (full) to verify the whole package stays green — with cache it's just LiSideBounds + NguyenRH1 root module + default target. Should be fine in foreground with 600s. Actually the full build is the "8770 jobs" — with cache, only changed modules rebuild. LiSideBounds changed → rebuild it + root. Let me run `lake build` detached to be safe (it could exceed 10 min if something cascades). Per protocol, detached + log file + poll. Actually — the single-file check already passed (25 s elaboration). A full `lake build` with everything cached should take ~1-3 min (LiSideBounds + root module + any reverse deps — none besides root). I'll run it in foreground with a 600 s timeout; if it times out, switch to detached. Also add the import line to the root first, plus the doc bullet for LiSideBounds.
LiSideBounds isn't root-imported yet. Adding it to the root per the sub-stage pattern, then full build.
tool: Edit
input
{
  "replace_all": false,
  "file_path": "D:\\Python\\Quantum\\research\\lean\\NguyenRH1\\NguyenRH1.lean",
  "old_string": "  NguyenRH1.SuzukiSkeleton \u2014 R-003 exact factorization (draft \u00a73.2)\n  NguyenRH1.ValleySkeleton \u2014 valley law statements (draft \u00a73.3)\n-/",
  "new_string": "  NguyenRH1.LiSideBounds   \u2014 ii\u2032-6-c (session 040\u2013041): the four side\n                             bounds of the L0 assembly \u2014 \u00a71 scaffolding\n                             (Z2hat_mono, the nearZerosSub mult-count\n                             bridge, logDeriv continuity, the Jlag norm\n                             factorization, the rectangle side\n                             decomposition, H/V-integral machinery, the\n                             left-vertical even symmetry, the two\n                             zero-freeness lemmas) + 6-c-ii\n                             (vIntegral_Jlag_left_norm_le: I_III \u2264\n                             4T((2/3)Z\u2082(T) + 10.5 log(T+2) + 48) +\n                             40\u00b71.3352)\n  NguyenRH1.SuzukiSkeleton \u2014 R-003 exact factorization (draft \u00a73.2)\n  NguyenRH1.ValleySkeleton \u2014 valley law statements (draft \u00a73.3)\n-/"
}
raw content_json (database row)
[{"type":"thinking","thinking":"LiSideBounds is NOT yet root-imported (the root imports stop at LiDogLeg + the two skeletons). The 6-c-i commit (a8c5b1e) didn't add it to the root — build 8770 jobs was probably `lake build NguyenRH1.LiSideBounds` directly. Per the pattern (each new file gets root-imported at its sub-stage), I should add `import NguyenRH1.LiSideBounds` to the root now (6-c-ii is the first sub-stage where new content lands; the file is complete enough). Let me add the import + doc line.\n\nThen: full build `lake build NguyenRH1.LiSideBounds` (fast, single module + root), write AuditSession041.lean, run it, commit.\n\nActually — for the build, per handoff notes: \"For lake: SINGLE command per detached spawn; short PrintAxioms in foreground.\" A single-module build (LiSideBounds + root re-elaboration) — the root re-elaborates quickly (it's just imports). `lake build NguyenRH1.LiSideBounds` builds just that module (deps already built). Should be ~1-2 min. Then `lake build` for the root import check — hmm, `lake build NguyenRH1` builds everything — that could take longer but everything's cached except LiSideBounds + root. Let me do `lake build` (full) to verify the whole package stays green — with cache it's just LiSideBounds + NguyenRH1 root module + default target. Should be fine in foreground with 600s. Actually the full build is the \"8770 jobs\" — with cache, only changed modules rebuild. LiSideBounds changed → rebuild it + root. Let me run `lake build` detached to be safe (it could exceed 10 min if something cascades). Per protocol, detached + log file + poll.\n\nActually — the single-file check already passed (25 s elaboration). A full `lake build` with everything cached should take ~1-3 min (LiSideBounds + root module + any reverse deps — none besides root). I'll run it in foreground with a 600 s timeout; if it times out, switch to detached.\n\nAlso add the import line to the root first, plus the doc bullet for LiSideBounds.","signature":""},{"type":"text","text":"LiSideBounds isn't root-imported yet. Adding it to the root per the sub-stage pattern, then full build."},{"type":"tool_use","id":"Edit_63","name":"Edit","input":{"replace_all":false,"file_path":"D:\\Python\\Quantum\\research\\lean\\NguyenRH1\\NguyenRH1.lean","old_string":"  NguyenRH1.SuzukiSkeleton — R-003 exact factorization (draft §3.2)\n  NguyenRH1.ValleySkeleton — valley law statements (draft §3.3)\n-/","new_string":"  NguyenRH1.LiSideBounds   — ii′-6-c (session 040–041): the four side\n                             bounds of the L0 assembly — §1 scaffolding\n                             (Z2hat_mono, the nearZerosSub mult-count\n                             bridge, logDeriv continuity, the Jlag norm\n                             factorization, the rectangle side\n                             decomposition, H/V-integral machinery, the\n                             left-vertical even symmetry, the two\n                             zero-freeness lemmas) + 6-c-ii\n                             (vIntegral_Jlag_left_norm_le: I_III ≤\n                             4T((2/3)Z₂(T) + 10.5 log(T+2) + 48) +\n                             40·1.3352)\n  NguyenRH1.SuzukiSkeleton — R-003 exact factorization (draft §3.2)\n  NguyenRH1.ValleySkeleton — valley law statements (draft §3.3)\n-/"},"extra_content":null}]